Finzels Reach Aurora Building

Finzels Reach Aurora Building

Description

A new build open plan office block in the centre of Bristol. Topfix Interiors installed external wall coverings, internal partitions, independent wall linings suspended ceilings including MF and metal tiles into grid, soffit hung acoustic rafts. Finishing included plastering to walls and tape & jointing to external perimeter bulk head detail.

topfix styling
topfix styling

Location: Bristol

Project duration: 40 Weeks

Project Type: New Build

Summary of works

  • Drylining

  • Suspended ceilings

  • MF ceilings

  • Plastering

  • Tape & Jointing

  • Acoustic wall panels

Products Used

  • Visqueen vapour barrier

  • British Gypsum metal sections

  • Gyproc 12.5mm WallBoard

  • Gyproc 12.5mm FireLine

  • Gyproc 12.5mm SoundBloc

  • Gyproc 12.5mm Moisture Resistant

  • Gyproc 15mm WallBoard

  • Gyproc 15mm FireLine

  • Gyproc 15mm DuraLine 

  • Gyproc 15mm DuraLine MR

  • Gyproc 15mm F Firecase

  • Gyproc 19mm CoreBoard

  • Isover APR

  • Rockwool RWA45

  • Rockwool Flexi

  • Rockwool Fire barrier

  • Gyproc FireStrip

  • Gyproc Sealant

  • 11mm OSB 3

  • 18mm Plywood

  • Thistle Bond-It

  • Gyproc ProMix LITE Joint Cement Promix lite

  • Gyproc QuickSand

  • Gyproc Joint filler

  • Gyproc Dri-Wall Adhesive

  • Thistle Bonding Coat

  • Thislte Multifinish

  • 600x600 Armstrong Orcal BP including OP19 pads

  • 1200x600 Armstrong mesh ceiling tile

  • Armstrong ceiling grid

  • Armstrong Axiom transition trim